BTS Commissioning
BTS Power on and Card Check. Transmission Connectivity Integration. Integrate BTS with BSC.
Call Tests and Record Result.
Integration of External Alarm and Alarm Testing. Labeling For all Cable and Sector.
ACCEPTANCE TEST
Preparing ATP Document for Testing. Arranging Testing Record.
To get Hardware Installation Acceptance Certification. Organizing ATP testing.
Sign-off ATP Certificate.